In short A new driveway in Saltash that needs a dropped kerb goes through Cornwall Council's vehicle crossing process, with a hardstanding of at least 2.5 m by 5.0 m and an accredited contractor for the kerb. D.A Building Services prepares and builds driveways in Saltash.

2.5 m wide5.0 m deeproad
Cornwall Council's smallest hardstanding for a vehicle crossing: 2.5 m wide by 5.0 m deep

Cornwall Council

A new crossing in Saltash, step by step.

  1. 1

    Check the space fits

    Cornwall Council will only consider a vehicle crossing if the hardstanding is at least 2.5 m wide and 5.0 m deep. Measure from the back of the pavement.

  2. 2

    Check planning first

    Cornwall Council says it is your responsibility to get the right permissions before you apply. A front driveway over 5 m² needs planning permission unless the surface lets water through or drains to a lawn or border.

  3. 3

    Apply to Cornwall Council

    The vehicle crossing application goes to Cornwall Council, following the steps on its dropped kerb page. Allow a minimum of six weeks.

  4. 4

    Pavement work by an accredited contractor

    The kerb and pavement work is done by a contractor holding the Streetworks Supervisor and Operative qualifications, with at least £5 million public liability cover. The council recommends getting three quotes.

  5. 5

    The driveway itself

    The ground is dug out, levels and falls are set so water runs away from the house, the base goes in and the driveway is built. Ask us about this part.

FAQ

Saltash driveway questions

How big does my driveway need to be for a dropped kerb in Saltash?

Cornwall Council will only consider a vehicle crossing if the hardstanding is at least 2.5 m wide and 5.0 m deep.

Do I need planning permission for a new front driveway?

Not if the surface lets water soak through or drains to a lawn or border. A front driveway over 5 m² that does neither needs planning permission.

My drive slopes towards the house. What can be done?

The levels are reset so water falls away from the house, towards a border, lawn or drain. Send us a photo from the road and one from the front door.

How long does the council take?

Cornwall Council says a vehicle crossing application takes a minimum of six weeks, so start that side early.

Planning a driveway in Saltash?

Send us a photo from the road and the size you have. We reply ourselves.

Your project

Tell us about your space.

A few quick taps, then send it straight to us. Nothing goes through this website.

Rather talk? 07940 259799 · dabservices@myyahoo.com

Question 1 of 5
What would you like help with?

Pick the closest. It is fine if you are still deciding.